Friday, 30 July 2021
Friday, 8 January 2021
Saturday, 11 April 2020
Boardman - Columbia River Transition scene UPDATE 2
12/4/2020 (AEST)
Well its been a busy two week on the layout since the last update. I've been concentrating on the trasition scene, up to the UP bridge at Nelle Bay (Formerly Nelle Inlet).
Follow the photos below and I'll take you through the latest changes!!!
![]() |
| Adding ground cover "Dirt & soil" at the work bench to a section styrofoam scenery. |
![]() |
| Here the section has been located in its postion, Glued with Hot glue to the baseboard. static grass was applied at the work bench. In the background are the basalt ciffs of the Columbia River Gorge |
![]() |
| Looking down the valley, between the basalt rocks. Fortunately for the UP, the river and time have created a water level route to follow. |
![]() |
| Here I'm standing on the opposite side of the Columbia River looking at the scene |
Onto Nelle Bay!
![]() |
Here I'm separating rocks by size fraction. Not a lot of science here, just grabbed the strainers I had available![]() |
![]() | ||
Here I've glued the rocks that protect the land from erosion.
|
![]() |
| Whilst the glue was drying on the river bank, I ballasted the mainline, and added some grass to the dirt road!!! |
![]() |
| Looking R/R Westbound |
![]() |
| A final photo of the west bank. Note how the meandering road and backdrop just seems to extend the scene. Track grade crossing signs, trees, farm animals and maybe a vehicle will fill out this scene. That will be done in stage 2. But for now its time to focus on the East side of Nelle Bay. |
![]() |
| I've jumped about 3 days ahead now. The land behind the bridge has been sceniced. The front of the embankment is recieving the rock protection. The boat ramp will be blended in a little more along the edges but the scene is taking shape. Note the suttle weathering on the UP Bridge sides. |
![]() |
| I'm on the opposite bank of the Columbia Rver, checking out the scene. |
![]() | |
|
Wednesday, 1 April 2020
Boardman - Columbia River transition scene
CORVID - 19 UPDATE:
WOW its been over two years since I posted on this blog!
I was sitting here and thinking what I could do to send to people, acquaintances, and internet contacts in our wonderful hobby, that could distract them in a nice way, from the current issues going on across the globe.
SO I thought that I would do a short "latest project" update so you all can see what my most recent efforts have been aimed at. I've been working on this project for about 5 weeks now. When I started there was bare plywood and a blue backdrop behind the scene. I vaguely understood what I wanted but was struggling for artistic licence. But I forged ahead anyhow and very soon I had a clear vision on how it was all going to come together. Thats the beauty of this hobby. Jumping in can be the best thing!!!!!
![]() |
| Nelle Inlet at Boardman. This inlet leads to a small boat Harbor (not modeled) The rocks are currently loose and are positioned so I can see and visualize how the scene will look! |
![]() |
| Mocked up rock protection for the banks of Nelle Inlet |
![]() |
| Here I've placed some loose rocks as a mock up as a test to determine what I want the scene to look like. The concrete road is a boat ramp!!! |
![]() |
| In this photo I've roughed in an access road that the UP would use to access the mainline for maintenance. The cliffs on the opposite side of the main are basalt cliffs and these transition the scene from flat rolling hills to the cliffs along the Columbia River |
![]() |
| Here I've added a DIRT road. I'm using powder pigments to simulate dirt. I used sculptamold as the road base , which I didn't really like the result. After this photo I painted over the top with house paint, earth color, and then put the powdered pigment on again. |
![]() |
| Here I've made the road run between the basalt cliffs. Maintaining access with the mainline, just so us "FOAMERS" can access and take photos up close and personal |
![]() |
| Now I'm adding grass down the center of the road. Its been down for a long time and only randomly used. Although I do think the locals use this road to access the Columbia River for fishing and camping!! |
![]() |
| Same same |
![]() |
| Sometime in the long long past there was a landslip in this part of the Canyon. The earth has since settled and the UP railroad deemed it safe to run the tracks right by the resultant slip. |
![]() |
| Them there cliffs are starting to get serious! |
![]() |
| Looking back towards Boardman |
![]() |
| Ballasting the class 1 mainline has now commenced. |
Saturday, 14 April 2018
UPBNSF JD Ops session - 14/4/18
Yesterday afternoon I held the scheduled 2 monthly operations session on the UPBNSF Joint Division. There were 16 starters for the session.
The session commenced at 2:30pm with the official opening of the Rogers Run branch line. A small opening ceremony was held, with the official cutting of the SIGN by no other than ROGER. In recognition of this momentous occassion , the UPBNSF JD management had a directors special available for the first run out to the PGE power plant and back.


Upon completion of official ceremonies, the pre-start was held and then we proceeded to get into the operations session. We ran 22 trains for the session and considering that some of these trains take 2 hrs to complete that was no mean feat!! Just ask Steve O and John B how long the Millwood turn takes!!!
It was great to see Merv Bagnall run the first revenue train on the Rogers Run branch. Merv and I go back 35+ years and it was without question that he would get to engineer the first revenue train across the branch line.








Operations ran from 3:00pm to 6:30pm where we stopped for Pizza. Some said their good byes for the night and a few guys stayed on to do another hr of ops.
The night wasn't without a couple of issues. The premier train on the layout, the UP Potash train had multiple (and I mean multiple) uncoupling issues and the engines, all equipped with sound decided to play up going up the spiral. Considering this is the most expensive train on the layout in real dollars ...yours truly is not happy!!!! I've been onto the manufacturer of the potash cars regarding the uncoupling issue previously but to date have not had any success in remedying the problem. They are MT 1015's and the reliability on this freight car is abysmal.
I also had a similar issue with a unit grain train. On this occasion I just think the weight of the grain train cars is just way to light, so I'll try and address that issue over the coming days.
All in all outside of those frustrations, the ops session went pretty smoothly. Everybody seemed to enjoy themselves and the effort put into the paperwork side of administering the ops session is starting to pay off.
Photos below of Ops session.


Thanks to all the participants. looking forward to the next ops in June.
| Ops session Gang. Missing Duncan Cabassi (taking photo) and Jeff Grenfell, (running late) |
| Looking at PGE Loop |
| Looking back at Boardman North |
| None other than ..."ROGER" |

Upon completion of official ceremonies, the pre-start was held and then we proceeded to get into the operations session. We ran 22 trains for the session and considering that some of these trains take 2 hrs to complete that was no mean feat!! Just ask Steve O and John B how long the Millwood turn takes!!!
It was great to see Merv Bagnall run the first revenue train on the Rogers Run branch. Merv and I go back 35+ years and it was without question that he would get to engineer the first revenue train across the branch line.
Operations ran from 3:00pm to 6:30pm where we stopped for Pizza. Some said their good byes for the night and a few guys stayed on to do another hr of ops.
The night wasn't without a couple of issues. The premier train on the layout, the UP Potash train had multiple (and I mean multiple) uncoupling issues and the engines, all equipped with sound decided to play up going up the spiral. Considering this is the most expensive train on the layout in real dollars ...yours truly is not happy!!!! I've been onto the manufacturer of the potash cars regarding the uncoupling issue previously but to date have not had any success in remedying the problem. They are MT 1015's and the reliability on this freight car is abysmal.
I also had a similar issue with a unit grain train. On this occasion I just think the weight of the grain train cars is just way to light, so I'll try and address that issue over the coming days.
All in all outside of those frustrations, the ops session went pretty smoothly. Everybody seemed to enjoy themselves and the effort put into the paperwork side of administering the ops session is starting to pay off.
Photos below of Ops session.
| Yardley |
| BNSFMWB entering Yardley |
![]() |
| Jeff (Yardmaster) working out his moves for the next train. T2 (Far end) is performing the switching |
| Cheney |
| Anthony and Iain watching UPMEB negotiate hangman curve |
| BNSFMWB passing Tyson meat at Wallula East |
| Anthony and Darren working the UPMEB at Wallula |
| Anthony and Darren working the UPMEB at Boardman |
| Steve and Wayne switching Boardman Industries |
| King Laurie (Dispatcher extraordinaire) |
| And then there is the paperwork! |
![]() |
| Your truly giving the pre start speech |
Subscribe to:
Posts (Atom)































